无码国产精品一区二区免费16_成在线人永久免费视频播放_无忧传媒MV国产在线观看_亚洲JIZZJIZZ在线播放

86-513-88213888
News
Home  >  News  >  FAQ
What details should be paid attention to when operating the shears
Publisher: Fengli Machinery Release time:2020-3-10
When CNC cutting pays attention to details:

1. At the beginning of preparation for operation on the shears, check all parts without abnormality, and the fastening screws (caps) must not be loose. Brakes should generally be reliable.

2. Adjust the distance strictly according to the thickness of the cylinder paper, and do not work overload. Mechanical properties cannot restore the pressure of the workpiece beyond a predetermined range.

Two, precautions for operation

1, must be placed in a smooth workpiece position immediately after

1. Check all parts without abnormality, and the fastening screws (caps) must not be loose. Brakes should generally be reliable.

2. Adjust the distance strictly according to the thickness of the cylinder paper, and do not work overload. Uncut (curled) mechanical properties beyond the specified range.

Two, precautions for operation

1. The person who must be placed in a stable position of the workpiece and is driving after the operation should be a clear signal that specifies a command.

2, hands should not be placed on cold-rolled steel plates, and the use of model inspection is allowed, after the model inspection is allowed to stop the circle.

3. When the scissors (curl) is enough for a complete circle and the end of the rolled plate, a certain allowance is allowed to prevent the workpiece from being injured by falling.

4. During the operation, the workpiece is forbidden to stand, and the cylinder on which no circle is found has good rolling.

5. Thickness of hot rolling, larger cylinder or a larger diameter of material strength, pneumatic tools should move the rollers and then roll and drop slightly after repeated rolling.

6. For cold-rolled narrow barrels, the shearing machine manufacturer should place it on the roll and roll it in the middle.

7. After the workpiece enters the roll, prevent hands and clothes involved in the roll.

Three, precautions stop

1. When the machine operator finds that the shearing machine makes an abnormal noise, it should immediately stop for inspection, adjustment and repair.

2, disconnect switch, disconnect the power.

3. After the workpiece stops at the designated location.
主站蜘蛛池模板: 海口市| 长兴县| 资兴市| 乌兰县| 潮安县| 财经| 阿勒泰市| 宁强县| 天门市| 南开区| 浦东新区| 平昌县| 湄潭县| 富阳市| 凤冈县| 吐鲁番市| 德江县| 浏阳市| 蓝山县| 长岛县| 武冈市| 融水| 凌源市| 连州市| 清远市| 望城县| 紫阳县| 长沙市| 易门县| 北碚区| 麻阳| 巴南区| 柞水县| 四会市| 中阳县| 黄龙县| 革吉县| 吴堡县| 嘉定区| 武宁县| 泸水县|